<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Locking an instance to update variables in Alfresco Archive</title>
    <link>https://connect.hyland.com/t5/alfresco-archive/locking-an-instance-to-update-variables/m-p/199908#M153038</link>
    <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;SPAN&gt;Why can't the service task be waiting. I mean, when it enters the service task, it checks if the variable value is correct, and if not, wait (eg loops back to a receive task with a timer).&lt;/SPAN&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
    <pubDate>Sat, 30 Aug 2014 16:56:27 GMT</pubDate>
    <dc:creator>jbarrez</dc:creator>
    <dc:date>2014-08-30T16:56:27Z</dc:date>
    <item>
      <title>Locking an instance to update variables</title>
      <link>https://connect.hyland.com/t5/alfresco-archive/locking-an-instance-to-update-variables/m-p/199907#M153037</link>
      <description>Hi all,We are building a complex product around the Activiti 5.15.1 engine and we occasionally need a background process to update the values of process variables in running processes (namely replacing a given URL stored in String variables with another one).We don't control the process design (thos</description>
      <pubDate>Thu, 21 Aug 2014 16:31:03 GMT</pubDate>
      <guid>https://connect.hyland.com/t5/alfresco-archive/locking-an-instance-to-update-variables/m-p/199907#M153037</guid>
      <dc:creator>franck102</dc:creator>
      <dc:date>2014-08-21T16:31:03Z</dc:date>
    </item>
    <item>
      <title>Re: Locking an instance to update variables</title>
      <link>https://connect.hyland.com/t5/alfresco-archive/locking-an-instance-to-update-variables/m-p/199908#M153038</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;SPAN&gt;Why can't the service task be waiting. I mean, when it enters the service task, it checks if the variable value is correct, and if not, wait (eg loops back to a receive task with a timer).&lt;/SPAN&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Sat, 30 Aug 2014 16:56:27 GMT</pubDate>
      <guid>https://connect.hyland.com/t5/alfresco-archive/locking-an-instance-to-update-variables/m-p/199908#M153038</guid>
      <dc:creator>jbarrez</dc:creator>
      <dc:date>2014-08-30T16:56:27Z</dc:date>
    </item>
  </channel>
</rss>

