<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Insane 2.x -&amp;gt; 3.0 Migration Time Required in Alfresco Archive</title>
    <link>https://connect.hyland.com/t5/alfresco-archive/insane-2-x-gt-3-0-migration-time-required/m-p/190016#M143146</link>
    <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;SPAN&gt;Hi,&lt;/SPAN&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;SPAN&gt;The amount of time required to migrate from 2.x up to 3.0 is insane.&amp;nbsp; For our database with 200G and 2 million nodes we are looking at a couple days to successfully migrate from 2.x to 3.0.&lt;/SPAN&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;SPAN&gt;This includes&lt;/SPAN&gt;&lt;BR /&gt;&lt;SPAN&gt;- Full database restructure of every table numerous times (eight hours or so)&lt;/SPAN&gt;&lt;BR /&gt;&lt;SPAN&gt;- Index Rebuild (Can be skipped partially).&amp;nbsp; For our repository a complete rebuild takes about 12 hours or so (even using the MT rebuild in 3.0)&lt;/SPAN&gt;&lt;BR /&gt;&lt;SPAN&gt;- Permission migration patch (This was estimated to take two days until we hacked around in the database to assign nodes to a default permission).&amp;nbsp; If lots of nodes have alf_node acl_id as null you will be waiting for days.&lt;/SPAN&gt;&lt;BR /&gt;&lt;SPAN&gt;- Version Store Migration Patch (A complete index rebuild (non-multithreaded of course) of the version2store.&amp;nbsp; This is estimated to come in at another 8 hours.&lt;/SPAN&gt;&lt;BR /&gt;&lt;SPAN&gt;- And we are not done yet!!!!!&lt;/SPAN&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;SPAN&gt;How are we supposed to schedule a downtime window to accommodate this down time when the switch over to production is to take place?&lt;/SPAN&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;SPAN&gt;Please note that we are using HP ML350 8 core machine with 6 gigs and RAID 5 SmartArray so our hardware should be pretty typical of enterprise customers.&lt;/SPAN&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
    <pubDate>Sun, 05 Oct 2008 23:11:38 GMT</pubDate>
    <dc:creator>callermd</dc:creator>
    <dc:date>2008-10-05T23:11:38Z</dc:date>
    <item>
      <title>Insane 2.x -&gt; 3.0 Migration Time Required</title>
      <link>https://connect.hyland.com/t5/alfresco-archive/insane-2-x-gt-3-0-migration-time-required/m-p/190016#M143146</link>
      <description>Hi,The amount of time required to migrate from 2.x up to 3.0 is insane.&amp;nbsp; For our database with 200G and 2 million nodes we are looking at a couple days to successfully migrate from 2.x to 3.0.This includes- Full database restructure of every table numerous times (eight hours or so)- Index Rebuild (C</description>
      <pubDate>Sun, 05 Oct 2008 23:11:38 GMT</pubDate>
      <guid>https://connect.hyland.com/t5/alfresco-archive/insane-2-x-gt-3-0-migration-time-required/m-p/190016#M143146</guid>
      <dc:creator>callermd</dc:creator>
      <dc:date>2008-10-05T23:11:38Z</dc:date>
    </item>
    <item>
      <title>Re: Insane 2.x -&gt; 3.0 Migration Time Required</title>
      <link>https://connect.hyland.com/t5/alfresco-archive/insane-2-x-gt-3-0-migration-time-required/m-p/190017#M143147</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;SPAN&gt;Hi&lt;/SPAN&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;SPAN&gt;Please state the exact source and target versions of the repository.&lt;/SPAN&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;SPAN&gt;Andy&lt;/SPAN&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 16 Oct 2008 13:49:44 GMT</pubDate>
      <guid>https://connect.hyland.com/t5/alfresco-archive/insane-2-x-gt-3-0-migration-time-required/m-p/190017#M143147</guid>
      <dc:creator>andy</dc:creator>
      <dc:date>2008-10-16T13:49:44Z</dc:date>
    </item>
    <item>
      <title>Re: Insane 2.x -&gt; 3.0 Migration Time Required</title>
      <link>https://connect.hyland.com/t5/alfresco-archive/insane-2-x-gt-3-0-migration-time-required/m-p/190018#M143148</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;SPAN&gt;2.1 Community to 3.0b&lt;/SPAN&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;SPAN&gt;It is also discouraging to discover that NTLM authenication for the CIFS connector is broken out of the box (this has been noted elsewhere) on the current 3.0 beta release.&amp;nbsp; I trust this will be fixed for the next beta release.&lt;/SPAN&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Sun, 19 Oct 2008 23:44:56 GMT</pubDate>
      <guid>https://connect.hyland.com/t5/alfresco-archive/insane-2-x-gt-3-0-migration-time-required/m-p/190018#M143148</guid>
      <dc:creator>callermd</dc:creator>
      <dc:date>2008-10-19T23:44:56Z</dc:date>
    </item>
  </channel>
</rss>

